DEADLINE ANCHOR
The reliability of our deadline anchor is important to a vessel’s operational safety. Engineered and manufactured to meet the demands and rigors of tough offshore installations, the deadline anchor complies with all relevant standards, reduces wear on the deadline, and facilitates safe drilling line procedures.
Parameter of DEADLINE ANCHOR
The Cameron deadline anchor is used to tie down the drill line and measure the load suspended from the top drive (i.e., hook load). The wire drum attached to the anchor is designed to rotate during a slip-and-cut procedure.
The reliability of our deadline anchor is important to a vessel’s operational safety. Engineered and manufactured to meet the demands and rigors of tough offshore installations, the deadline anchor complies with all relevant standards, reduces wear on the deadline, and facilitates safe drilling line procedures.
1、The deadline fixer is designed and manufactured in accordance with SY5320 and other techinal standards.
2、The main loaded parts are made of good –quality steel
3、Each unit will be tested and inspected before delivery and detected with a non-destructive detector strictly according to the related standards.
Model of weight indicator | Specification of deadline fixer | Max deadline pulling force(lbs) | Max load(lbs) | Deadline numbers | ||
JZ250 | JZG24 | 53000 | 530000 | 430000 | 10 | 8 |
JZ200 | JZG20 | 44000 | 440000 | 350000 | 10 | 8 |
JZ150 | JZG18 | 40000 | 320000 | 240000 | 8 | 6 |
JZ100 | JZG15 | 33000 | 260000 | 200000 | 8 | 6 |
Want to Know More Detail About This Drilling Equipment?
Related products
-
Hoisting
HOOK BLOCK
-
Hoisting
ROTARY TABLE
-
Hoisting
POWER SWIVEL
-
Hoisting
TOP-DRIVE DRILLING UNIT